The 850 is not an order yet.
Purchase orders arrive at the VAN or the portal. Item numbers, ship-to codes, and pack terms do not match NetSuite. Someone translates by hand.
Winning the account is the easy part. The vendor guide arrives with a test window, a compliance calendar, and a chargeback schedule. Until the 850 lands in NetSuite as a real sales order and the 856 leaves with the carton, someone in ops is reading PDFs and keying orders.
Purchase orders arrive at the VAN or the portal. Item numbers, ship-to codes, and pack terms do not match NetSuite. Someone translates by hand.
ASNs built from the order instead of what was packed. Partial shipments, split cartons, and late transmission show up as chargebacks weeks later.
One retailer wants GS1-128 labels and SSCC on every carton. Another wants a single 810 per shipment. The first build was mapped for one partner and copied for the next.
Pick, pack, and ship happen at the warehouse. The ship-confirm has to come back through Celigo before NetSuite can send anything. When that hop fails, nobody sees it until the partner does.
Rejected 997s and failed mappings queue in a dashboard nobody opens.
One Celigo flow structure per document type (850, 855, 856, 810, 846), with partner-specific mapping as configuration, not a new build each time.
Sales orders, item fulfillments, and invoices drive the outbound documents. Customer-item cross-references live in NetSuite, not in a spreadsheet.
Carton and tracking data from the warehouse flow back before the 856 is built, so the ASN describes what actually shipped.
Rejections, acknowledgment gaps, and mapping failures alert with the order in context. Retry or fix, not silent.
Structured proposal, architecture, timeline, then build. Optional managed services for the next partner.
Brands on NetSuite adding their first or next retail or wholesale trading partner.
Operators whose existing EDI was built for one partner and is now being copied for the third.
Ops teams paying chargebacks for ASN timing or accuracy.
3PL-fulfilled brands where the warehouse is the missing link in the EDI chain.
vendor guides, current VAN/EDI setup, Celigo instance, NetSuite item and customer setup, 3PL path. Structured proposal before work starts.
document flows, partner mapping, cross-references, error queues, sandbox testing with real documents.
test cycles with the trading partner on their calendar, then production with monitoring.
runbook and pattern so partner two and three are configuration, not projects.
Bring the vendor guide, your current Celigo and NetSuite setup, and the partner's test calendar. We'll walk what has to exist before the first 850 arrives.